Renovation Cost Estimator

m2
AED

Taking out what is there and getting it off site.

AED
AED
AED
AED
AED
AED

Sanitary ware, taps, kitchen appliances, light fittings.

AED

Building approvals, deposits, project management.

The line that decides whether a renovation finishes.

Your answer

Total budget

AED 0

Put your own quotes in above and this fills in.

Trades
AED 0
Fixtures and appliances
AED 0
Approvals and management
AED 0
Before contingency
AED 0
Contingency at 15%
AED 0

A structure for your own numbers, not a price list. Get real quotes for each trade and put those in.

Renovation Cost Estimator for Dubai and the UAE

This tool builds a renovation budget from the trades that make it up. You put in your own figures for each part and it adds them together.

It also adds a contingency, which is the single most important line in any renovation budget and the one most often left out.

We do not put prices in. Renovation rates depend on the property, the specification and the contractor, and a made up number would give you a budget that fails at the first surprise.

Why contingency is not optional

Almost every renovation that goes wrong financially goes wrong the same way. The budget was right for the job as it was understood on day one.

Then a wall comes down and the pipework behind it is not where the drawing said. Or the floor comes up and the screed underneath is failing. Or a wet area is opened and there was never any waterproofing.

None of that is anybody being dishonest. It is a building revealing what is inside it, which nobody could see before the work started.

A contingency is the money set aside for that. Ten per cent on a new property with light work, fifteen on a normal renovation, twenty or more on an older building.

The mistake is treating it as spare money and spending it on an upgrade in week two. Then the first surprise stops the job.

What a renovation is actually made of

Working through these is how a budget stops being a guess.

  • Demolition and disposal

    Underestimated constantly. Breaking out is quick; carrying it out of a tower and disposing of it properly is not.

  • First fix services

    Plumbing and electrical inside walls and floors, before anything is closed up. This is the part nobody sees and the part that is expensive to change later.

  • Waterproofing

    Any wet area. Skipped often, and the cost of skipping it is a ceiling in the flat below.

  • Tiling and flooring

    Usually the largest single trade by cost in a bathroom or kitchen renovation.

  • Joinery

    Kitchens, wardrobes and any fitted furniture. Often the biggest number in the whole project.

  • Second fix and finishes

    Fitting the sanitary ware, sockets, doors and handles, then painting. It looks fast and it takes longer than expected.

What is different about renovating in the UAE

Approvals matter more than people expect. Buildings and communities have their own rules about what can be changed, when work can happen and how materials come in and out.

A tower will usually want the contractor registered, insurance in place, a deposit lodged and work confined to certain hours. That is not a formality, and it affects both cost and programme.

Waterproofing is checked, and rightly. Water travelling from one unit to another is the single most common serious problem in apartment renovation here.

Lift access and material handling is a real cost in a tower. Everything comes in and out through a service lift on a booking.

And summer changes the programme. Some work is slower in the heat, and site working hours in the hottest months are restricted.

None of this is a reason not to renovate. It is a reason to ask about approvals and access before signing anything.

Where renovations overrun

The common causes, and they are mostly decisions rather than accidents.

  • Changing your mind mid job

    The most expensive thing you can do. A change after first fix means undoing work that was already paid for.

  • Not deciding the specification early

    Tiles, sanitary ware and kitchen finishes should be chosen before work starts. A trade waiting for a decision is a trade being paid to wait.

  • Long lead items ordered late

    Some kitchens, stone and imported fittings take weeks. Ordering them when the trade needs them stops the whole job.

  • Hidden condition

    Old pipework, failed waterproofing, poor screed. This is exactly what the contingency is for.

  • Vague scope

    A quote that says "bathroom renovation" without listing what is included leaves every ambiguity to be argued about later.

  • Too many separate contractors

    Each one waits for the last. Coordination is real work, and if nobody is doing it, the programme stretches.

How to use this properly

Get a real quote for each trade and put those numbers in. That is the whole point of the tool.

If you only have one overall quote, break it down. Ask the contractor to split it by trade. A contractor who cannot or will not is telling you something.

Then compare the split against this structure. If a line is missing, either it is genuinely not needed or it has been left out and will appear later as a variation.

Add the contingency and do not touch it. Treat it as a separate account that only gets opened when something is discovered rather than chosen.

And keep a record of every variation as it happens, agreed in writing before the work is done. Most renovation disputes are about work nobody wrote down.

Questions people ask

How much does a renovation cost in Dubai?

It depends entirely on the property, the specification and the scope. This tool gives you a structure for your own quotes rather than a price, because a made up figure would be useless.

How much contingency should I allow?

Ten per cent on a new property with light work, fifteen on a normal renovation, twenty or more on an older building where the condition behind the walls is unknown.

What makes renovation costs go over budget?

Changing your mind after work starts, deciding the specification late, ordering long lead items late, and hidden condition behind walls and floors.

Do I need building approval to renovate in Dubai?

Usually yes, and the building or community will have its own requirements too. Ask about approvals, registered contractors, deposits and working hours before signing anything.

Should I use one contractor or several trades?

One contractor coordinating is usually faster and less stressful. Separate trades can be cheaper on paper and the coordination becomes your job.

What is the most commonly missed cost?

Demolition and disposal, and waterproofing. The first is underestimated because carrying waste out of a tower is slow. The second gets skipped and then costs a ceiling below.