You call a different contractor every time
Each one spends the first hour learning the property. You pay for that hour every time, and nobody ends up knowing the history of anything.
Annual Maintenance (AMC)
An annual maintenance contract Dubai owners are happy with is one they read before signing. It is a document first and a service second, and almost every dispute about one was decided by wording nobody looked at.
Overview
Planned visits on a written schedule, plus a contractor who already knows your property when something fails at eleven at night.
Scheduled servicing of the systems in your property — air conditioning, water, electrical, and the fabric items that fail quietly — with the asset list agreed before the first visit.
Planned work catches the cheap failures early. The expensive ones are almost always a small fault that ran unattended for months because nobody was looking.
Owners and tenants who would rather pay a known figure once than negotiate a rate with a stranger during an emergency.
It is not insurance and it is not an end to breakdowns. Anybody selling it that way has wording in their contract that says otherwise.
Symptoms
Some properties genuinely do not need one. These are the situations where the arithmetic changes.
Each one spends the first hour learning the property. You pay for that hour every time, and nobody ends up knowing the history of anything.
Peak-season failures are almost always spring failures that nobody looked for. The cost difference between the two is the whole argument for planned work.
Water damage is found late in properties nobody inspects. The pipe repair is minor; the ceiling, the flooring and the drying are not.
Multiple properties mean multiple contractors, multiple invoices and no consistent record. This is where a single contract stops being a convenience and starts saving money.
A landlord who has no maintenance arrangement gets called about everything and has to price each item under time pressure, usually from a tenant who has already chosen the contractor.
A property with no record is a property where every technician starts from zero and every quote includes an allowance for what they cannot see.
Loose terminations heat up slowly and fail suddenly. It is the one item on this list where the failure is not an inconvenience.
Unplanned work costs more per job and arrives at the worst time. A contract does not remove the spend, it moves it somewhere you can budget for.
Why TRAXICO
Most of what separates contracts is not the work. It is what the document says and whether anybody has to argue about it later.
We survey and write down what is actually installed before quoting. A contract priced from a floor plan is a contract that discovers surprises at your expense.
Every contract in this industry excludes things. Ours names them at the quotation stage rather than leaving them to be discovered on the first invoice.
Air conditioning, water and electrical under one agreement, so a fault that crosses two trades does not become two contractors disagreeing about whose it is.
What was done, what was found and what was deferred, per visit. It is what turns a contract into a maintenance history rather than a series of visits.
We do not print a response time or an unlimited call-out policy on a web page. Whatever is agreed goes in your contract in writing, where it means something.
A small apartment where the building covers the plant frequently does not need a contract. Saying so costs us a sale and is the reason the recommendation is worth anything.
Scope
Not a list of promises — a list of the things a contract has to define before it is worth signing.
Every unit, board, pump, tank and heater covered, listed with its location. Without it, "the air conditioning" means whatever the technician finds on the day.
How many planned visits, roughly when in the year, and what happens on each. "Regular servicing" is not a schedule and cannot be held to.
Filters, coils and drains on the cooling side; valves, traps and visible pipework on the water side; terminations and protective devices on the electrical side.
The point where a repair stops being covered work and becomes a quotation. This single clause causes more disputes than everything else combined.
Consumables, major components, anything concealed, damage from misuse, and work belonging to the building rather than the unit. Named, not implied.
A record after each visit of what was inspected, what was found and what is recommended, so deferred work is a decision rather than an omission.
Who to call outside working hours, who answers, and how a job gets raised. More useful than any headline arrival time, because it is the part that can be verified.
Contract length, notice period and what happens to the records at the end. A contract you cannot leave is a price that only moves in one direction.
Quoted separately, so nothing appears on your invoice unexpectedly.
How It Works
The survey happens before the price, because the survey is what the price is made of.
Type, size, age and whether it is occupied, tenanted or empty. An empty villa and a family home with three children are different maintenance problems.
We walk the property and write down what is installed, its condition and its age. Anything already faulty is identified now rather than absorbed into the contract.
A contract covers maintaining working systems. Repairs needed on day one are priced as repairs, because pricing them into an annual figure hides them.
What is covered, how often, and what is excluded — agreed in writing before anything is signed rather than described in a conversation.
The longest of the year. Baseline readings, condition of each asset recorded, and the state the property is actually in written down rather than assumed.
On the agreed cycle, with a report each time covering what was done, what was found, and what should be watched before the next visit.
Before renewal, what the year actually cost and what it found. If the contract turned out to be wrong for the property, that is worth saying rather than renewing quietly.
Our Work
What the job actually looks like — the state we find systems in, and the state we leave them in.
Photographs of completed work are being added. We would rather show an empty frame than stock images of somebody else's technicians.
Benefits
The value is mostly in what stops happening.
Almost every expensive failure was a small fault that ran unnoticed. Planned inspection is how the small version gets found.
The spend does not vanish, but it stops arriving as a series of surprises at the least convenient moments of the year.
What was serviced, when, and what was found. It shortens every future diagnosis and it is worth something at sale or handover.
A contractor who already knows the property does not spend the first hour of an emergency working out what is installed and where the valves are.
A written asset list and a named exclusion list mean a disagreement is settled by reading rather than by whoever is more insistent.
For a landlord, a maintenance route that does not run through your phone is most of the value, and it is rarely the thing that gets sold.
Worth Knowing
Everything below is written to be used against our own quotation as readily as anybody else's.
People are disappointed by contracts because they bought one half and expected the other, so it is worth separating them.
The first half is planned work. Visits on a schedule, whether or not anything is wrong: filters changed, coils and drain lines cleaned, valves exercised, seals and terminations checked, readings taken and compared with the last set. This half reduces how often something fails, and it is the part that looks like nothing is happening. A visit where the technician finds nothing wrong is the visit working correctly, which is a difficult thing to feel good about paying for.
The second half is a relationship for the day something fails anyway. A contractor who holds your asset list, has been in the plant space and knows where the isolation valves are does not begin a breakdown by discovering the property. On a leak at midnight that difference is the difference between a wet cupboard and a wet floor below.
What neither half buys is an end to failures. Components fail on their own schedule and some of them fail without warning. Any contract sold as "no more breakdowns" has a clause somewhere that quietly agrees with this paragraph, and you will meet that clause at the worst possible moment.
Which of the two halves matters more depends entirely on the property. A well-maintained apartment where the building covers the plant is mostly buying the second half, and might be better served by a good contractor's number than a contract. A villa with its own roof plant, tank and pump is buying the first half heavily, because there is nobody else looking at any of it.
Two quotes for the same property can differ by a factor of three, and the difference is never generosity. Something has been taken out, and it is usually one of five things.
Visit length is the first and the least visible. A proper cooling service on a unit takes real time — filters, coil, drain line and tray, electrical connections, readings, then reassembly. A visit that takes twenty minutes has looked at the filter and nothing else, and it will be recorded identically on the report.
Scope per visit is the second. A contract may name three visits a year and define only the first as a full service, with the others as inspections. That is a legitimate structure if it is stated. It is not legitimate when the customer believed they were buying three services.
The parts boundary is the third and the sharpest. A contract can cover labour only, with every component quoted separately, which makes for a low annual figure and an invoice on every visit. Again, that is fine if it is written down. It is the commonest thing not to be.
The asset list is the fourth. A quote given over the phone without a survey has been priced on an assumption, and the difference between the assumption and your property becomes an extra later, always in the same direction.
And out-of-hours cover is the fifth. Emergency attendance is expensive to provide, so a very low annual figure has almost certainly excluded it or priced it separately. Ask directly, because the answer is rarely volunteered.
None of this makes a cheaper contract wrong. It makes a comparison of two annual figures meaningless unless the five items above are compared alongside them.
If you read only one clause before signing, read this one.
Contracts sit somewhere on a line. At one end, labour only: the visits are covered and every component is chargeable. At the other, comprehensive: parts included up to some boundary. Most sit in between, covering consumables and small items while excluding major components.
The trouble is that the boundary is usually described in words like "minor parts" and "consumables", which are not definitions. Is a capacitor a minor part? A contactor? A thermostat? A tap cartridge? A float valve? Reasonable people disagree about every one of them, and the disagreement always surfaces when something has already failed and the property is uncomfortable.
The fix is unglamorous and takes five minutes. Ask for examples in writing: name six components across the systems in your property and ask which side of the line each falls on. A contractor who will answer that has thought about their own contract. One who will not is planning to decide later.
The second question is what rate applies to parts that are not covered. Supplied at cost, at a fixed markup, or at whatever the price is on the day? This is a legitimate commercial decision either way and it should not be a mystery.
And the third: who owns the decision to replace rather than repair? A contract where the contractor decides unilaterally, and charges for the outcome, has an incentive problem written into it. A threshold above which a replacement needs your approval solves it.
Almost every maintenance contract in this market advertises an arrival time, and it is the least reliable number on the page.
Consider what has to be true for a four-hour response to mean anything. There has to be an engineer free at that hour, in that part of the city, with the right trade for the fault, carrying or able to collect the likely part. On an August afternoon when the whole city is calling about cooling, none of those things is dependable, and the number that was printed on the brochure becomes an aspiration.
So the useful questions are different, and they are about process rather than speed. Who answers the phone outside working hours — a person, an answering service, or a message you hope somebody reads? How is a job raised and what happens to it after it is raised? Is out-of-hours attendance inside the contract or billed at a call-out rate? And what is the escalation route when the first response has not fixed it?
Those answers can be verified. An advertised arrival time cannot be verified until the day it matters, which is the day it is least likely to be true.
We do not print a figure here, because we would be printing it for the same reason everybody else does. What is agreed with you goes in your contract, where it is a commitment rather than a marketing line.
A short list of claims that should make you slow down, all of them common in this market.
"Unlimited call-outs." No contractor can staff unlimited attendance for a fixed annual fee, so either the word unlimited is qualified somewhere in the document, or the contract is priced on the assumption you will not use it. Both are worth knowing before signing.
"Everything covered." Nothing covers everything. Concealed pipework, building-owned plant, damage from misuse, and components at the end of their life are excluded from every contract written by anybody. A document that does not say so has not removed the exclusions, it has removed the honesty about them.
"No breakdowns." A contract reduces the failures that come from neglect. It does not stop a compressor from failing or a component from reaching the end of its life. Prevention is a probability argument, not a guarantee, and it is a good one on its own terms.
"Free annual inspection" as the entire offer. An inspection with no defined scope is a sales visit, and what it finds tends to correlate with what the visiting company sells.
And a contract with no exit. Twelve months with a notice period is normal. A multi-year commitment with automatic renewal and no break is a commercial structure that benefits one party, and it is not you.
This is the section most maintenance companies leave out, which is why it is worth reading.
A small apartment in a well-run building is the clearest case. The chilled water plant, risers, tanks and lifts are the building's responsibility and are already paid for through service charge. What is left inside your front door — a fan coil unit, some taps, a water heater and a distribution board — is a short list. A contract on that list can cost more per year than servicing it directly when it needs it, and a good contractor's number does the rest. The line between the two, and where exactly it falls, is what apartment maintenance contract Dubai is about.
A property under a developer warranty is the second case. New handovers usually carry a defect liability period, and buying a maintenance contract that covers work the developer is already obliged to do is paying twice. Read the handover documents first.
A property you are about to sell or exit is the third. An annual contract with eleven months to run is not an asset to a buyer and is rarely transferable in practice.
And the case where you simply want to know what needs doing rather than commit to a contract: that is a survey, a report and a plan, and home maintenance Dubai sets out what a property in this climate actually needs and when. Plenty of owners read that, do three things, and never need a contract at all.
Where a contract genuinely earns its place is where there is plant nobody else is looking at, several properties to keep track of, tenants between you and the problem, or a system where an unnoticed fault becomes expensive quickly. Those are real, and they are the reason this page exists — but they are not every property.
Put the two documents side by side and compare eight things rather than two numbers.
The asset list: does each contract cover the same equipment, or has one quietly left out the water heater in the ceiling void and the pump on the roof?
Visits: how many, and is each one a service or an inspection? Multiply out what is actually being attended.
Scope per visit: what is done to each asset. This is where the twenty-minute visit hides.
Parts: where the boundary sits, and at what rate the uncovered side is charged.
Exclusions: read the list in full. If there is no list, that is the finding.
Out of hours: included, excluded, or chargeable — and who answers.
Reporting: is there a written record per visit, and do you get it?
Term: length, notice, renewal mechanism, and what happens to your records when you leave.
A contract that wins on all eight and costs slightly more is cheaper by the end of the year. A contract that wins on price alone has moved the cost rather than removed it, and the place it usually reappears is the first invoice after the first failure.
Pricing
Priced from the asset list and the visit schedule. Both are established at the survey, which is why we do not quote annual figures over the phone.
One system, on its own cycle.
Quoted on inspection
Every system under one agreement.
Quoted on inspection
For a property you do not live in.
Quoted on inspection
Several properties on one agreement.
Quoted on inspection
No surprises on the invoice
If the survey shows the building already maintains most of what you were about to pay us to maintain, we will tell you and quote for the short list that is genuinely yours. It is a smaller contract and it is the honest one.
Coverage
Technicians are dispatched from whichever team is closest, which is why a call from Business Bay and one from Dubailand get different arrival windows.
Related
Property problems rarely stay inside one trade.
Where the roof plant, the tank, the pump and the outside are all yours.
Read moreWhere the building covers more than most owners realise.
Read moreA single-trade contract on the system that carries most of the risk here.
Read moreWhat a property in this climate needs and when, before any contract.
Read moreThe individual service a cooling contract schedules through the year.
Read moreThe failure planned inspection is trying to find before a ceiling does.
Read moreTrack Record
The numbers behind the work.
These figures are being confirmed against our records before publication.
Questions
What customers ask before booking, answered without the sales pitch.
Whatever the asset list and the scope say, which is why both belong in the document. Broadly: scheduled servicing of the systems in the property, plus attendance when something fails. What it does not cover, in any contract written by anybody, is building-owned plant, concealed pipework until it is opened up, damage from misuse, and major components at the end of their life. A contract that claims to cover everything has not removed the exclusions, only the honesty about them.
It depends on the property, and the more useful question is what happens on each visit. Two thorough services are worth more than four twenty-minute inspections, and a contract that names three visits may define only one as a full service. Ask for the scope per visit in writing and compare that, rather than comparing visit counts.
Ask where the boundary sits and get examples. Most contracts cover consumables and small items while excluding major components, but "minor parts" is not a definition — name six components in your property and ask which side each falls on. Also ask what rate applies to the parts that are not covered, and whether replacing rather than repairing needs your approval above some value.
We do not print one, and we would treat one printed on any website with caution. On a peak-season afternoon, arrival depends on an engineer of the right trade being free in the right part of the city with the right part. What we will put in your contract is the escalation route: who answers out of hours, how a job is raised, and whether emergency attendance is inside the contract or charged. Those can be verified; an advertised arrival time cannot.
Not always, and it depends on the property. Where there is plant nobody else inspects, several units to track, or tenants between you and the problem, it usually is. In a small apartment where the building maintains the plant, servicing the short list directly can cost less. We would rather say so at the survey than sell a contract that is wrong for the property.
In practice it rarely is, and an annual agreement with months left to run is not something a buyer values. What does transfer usefully is the maintenance record — what was serviced, when, and what was found. That is worth having at a sale or a handover, and it is a reason to insist on written reports whoever holds the contract.
They are quoted as repairs rather than absorbed into the annual figure. A contract covers keeping working systems working; pricing day-one faults into it hides them and makes the contract look worse value than it is. The first visit is the longest of the year for exactly this reason — it establishes what condition the property is actually in.
That is a different contract with different obligations, written for an owners association or a developer rather than a resident. Common areas, lifts, fire systems and facade carry statutory responsibilities that a residential agreement does not touch. It is covered on building maintenance contract Dubai.
The tenant contacts us instead of you, work is authorised against a threshold you set, and you get the record. Most of the value to a landlord is not the servicing, it is that the maintenance route stops running through your phone. Between tenancies the condition record is also what settles arguments about what was already like that.
Check the handover documents first. New properties usually carry a defect liability period during which the developer is obliged to fix things, and buying a contract that covers the same work is paying twice. Once that period ends, a new property is the best possible time to start a contract, because the maintenance record begins from a known state.
That is often the right answer. Air conditioning is the usual candidate in this climate and is covered on ac maintenance contract Dubai; water systems and electrical distribution are the other two that justify a contract on their own. Buying a broad contract to get a discount on the one system you actually needed is a common way to overspend.
Compare eight things rather than two prices: the asset list, the number of visits, the scope per visit, the parts boundary, the exclusion list, the out-of-hours arrangement, the reporting, and the term and notice period. A contract that wins on all eight and costs slightly more is cheaper by the end of the year. One that wins on price alone has usually moved the cost to the first invoice after the first failure.
Book Today
Tell us what it is doing and we will give you a realistic arrival window. Free inspection when the repair goes ahead.
Book a Visit
Give us the details and we will call you back to confirm a time. The more you can tell us, the better prepared the technician arrives.
Call rather than wait for a contract to be set up. A breakdown gets attended as a repair, and whether a contract makes sense for the property is a conversation for afterwards.
Full Coverage
All 30 Dubai communities, grouped by property type because the work genuinely differs between a tower in DIFC and a villa in Arabian Ranches.