The cabinet under the sink has swollen at the base
Water has reached an unsealed cut edge of engineered board. The swelling is permanent, and the leak that caused it is usually still there.
Carpentry
A kitchen is three purchases in one number: the carcass, the front and the hardware. Kitchen cabinet installation Dubai lives or dies on the third one and on what happens at the cut edges, neither of which appears on most quotations.
Overview
New kitchens, replacement runs, and cabinets bought elsewhere that need somebody to make them fit the room.
The box. Nobody sees it and it decides everything structural — how it holds a fixing, how it takes weight, and how it behaves when water reaches a cut edge.
Doors and drawer faces. This is what the kitchen looks like and what most of the money is visibly spent on, and it can be changed later without touching the boxes.
Hinges, runners, lifts and handles. Touched several times a day, and the reason a kitchen either still lines up in five years or does not.
The one unit that lives with water. It fails differently from the rest of the kitchen and it is worth treating as its own problem.
Symptoms
Some of these are a new kitchen. Several of them are a day of work on the kitchen you already have.
Water has reached an unsealed cut edge of engineered board. The swelling is permanent, and the leak that caused it is usually still there.
Usually hinges that were fitted but never adjusted, which is a correction rather than a repair. If adjusting will not hold it, the fixing has failed in the board.
Runners out of alignment, overloaded, or mounted into board that has given up. All three are fixable; which one it is decides how.
Either the wall is out of plumb and the worktop was not scribed to it, or the run was never levelled. Sealant is a cover, not a fix.
A dead gap at the end of a kitchen collects everything and cleans badly. Filler panels are a specification item, not an afterthought.
Heat and steam at the edge of a front. Wrapped and foiled fronts are the most vulnerable, and the damage starts at an edge rather than in the middle.
Very common. Supply and installation are separate purchases, and flat-packed carcasses still need levelling, scribing and hardware setting.
Aperture sizes are not interchangeable between brands, and integrated appliances need specific door and hinge arrangements. Better found before installation than during.
Why TRAXICO
The parts of this job that go wrong are all invisible on the day it finishes.
Not each unit to itself. The worktop is templated against what we leave, so a base run that steps by three millimetres becomes a fabricator's problem and then yours.
Cut edges sealed, penetrations kept tight, and the base treated as something that will get wet at some point in its life — because it will.
Every hinge and runner adjusted until the gaps read consistently across the whole run. Most kitchens we are called back to were never set at all.
Plumb, level and the wall's construction, because a wall unit loaded with crockery is only as good as what its fixings went into.
Aperture, door swing, hinge type, services and ventilation, before the cabinet is fixed rather than when the appliance arrives.
Plumbing, electrics, worktop templating and tiling all have a place in the order. Getting it wrong is what turns a week into three.
Scope
Roughly in order, because in a kitchen the order is most of the job.
Wall lengths at worktop height and at floor level, plumb, floor level across the run, ceiling height, and where services and windows land.
Door swings, appliance clearances, corner access and the space a person needs to stand. Layouts that work on paper regularly do not work in the room.
Units removed, services capped by the right trade, and the walls and floor inspected — because what was hidden behind the old kitchen is now the constraint.
A single line the whole run is set to. Everything after this — base units, worktop, wall units, splashback — refers to it rather than to the floor.
Legs adjusted, units clamped and joined to each other so the run behaves as one object, and fixed back where the wall will take it.
Fixed into what is actually behind the surface, with anchors matched to it, and set to the same datum so the gap under them stays constant.
Cut edges sealed, the base protected, and openings for waste and supply cut tightly rather than roughly. This is the cabinet that fails first.
Doors and drawers hung, then set. Gaps checked along the whole run rather than door by door, and plinths, fillers, end panels and cornices scribed in.
Quoted separately, so nothing appears on your invoice unexpectedly.
How It Works
A kitchen is the one room where four trades have to arrive in the right order, and the cabinets are in the middle of it.
The room measured as built, the layout tested against door swings and clearances, and appliance apertures confirmed against the actual models.
Water, waste and electrical brought to the agreed positions before cabinets exist. Moving a waste after the units are in is demolition, not adjustment.
The old kitchen removed and the walls and floor assessed. Anything that needs patching, levelling or treating happens now while access is open.
Set to a datum line, joined into a run, and checked along the full length. This is the surface the worktop will be templated against.
The fabricator templates against the installed run, then makes. There is a wait here, and it is not padding — templating early is how worktops arrive wrong.
Sink and hob cut-outs done by the fabricator, then plumbing and electrical second fix, splashback, wall units and tall units.
Doors and drawers hung and set across the run, plinths and fillers scribed, everything opened and closed with you present, and the area cleaned.
Our Work
What the job actually looks like — the state we find systems in, and the state we leave them in.
Photographs of completed work are being added. We would rather show an empty frame than stock images of somebody else's technicians.
Benefits
Very little of it is visible on handover day. All of it is visible in year five.
Hardware that was set rather than merely fitted stays set. A run of fronts with consistent gaps is the clearest single sign of a kitchen fitted properly.
Every kitchen gets water under the sink eventually. Sealed edges are the difference between drying it out and replacing the unit.
A level, square run templates cleanly. An uneven one produces a worktop that rocks, gaps at the wall or has to be remade at somebody's cost.
Loaded crockery is heavy and the fixing is the whole story. Anchors matched to the actual wall construction rather than to whatever is in the van.
Most kitchen delays are sequencing, not work. Templating on time and first fixing in the right positions removes the two biggest stalls.
Carcass, edges, hardware and exclusions written down means a comparison between quotes is real rather than a comparison of two numbers.
Worth Knowing
Five things, and only one of them is what the kitchen looks like.
The most useful thing to understand about a kitchen quotation is that it covers three different products that fail in three different ways, and that they are usually priced as one.
The carcass is the box. It is never seen once the kitchen is in, which is exactly why it is where money gets saved. What it determines is structural: how well it holds a fixing, whether it stays square under load, how it behaves when a shelf is loaded with tinned food, and — most importantly here — what happens when water reaches a cut edge.
The front is the doors and drawer faces. This is what people mean when they say they like a kitchen. It is also the part that can be replaced later without touching anything else, which makes it the least permanent of the three decisions despite being the one everybody agonises over.
The hardware is the hinges, runners, lifts and handles. It is touched several times a day for as long as the kitchen exists. It is the part that decides whether the doors still line up in five years, whether a drawer full of pans still closes with one hand, and whether the kitchen feels solid or feels cheap when you use it. It is also, reliably, the part nobody asks about.
The practical consequence: if a budget has to be cut, the front is usually the right place to cut it and the hardware is almost never the right place. A plain front on good boxes with good hinges is a kitchen that works and can be smartened later. A dramatic front on poor boxes with poor hinges looks excellent in photographs and stops behaving within a couple of years.
So when comparing two quotations, the questions are what the board is, what the exposed edges get, and whose hinges and runners are being fitted, by name. Those three answers explain most of the difference between two numbers that appear to describe the same kitchen.
The single most consequential half hour of a kitchen fit is establishing a datum, and it happens before any unit is fixed.
A datum is one level line marked on the wall that the entire installation refers to. Base units are set to it, the worktop sits on it, wall units are hung relative to it, and the tiled splashback fills the space between. Everything is measured from that one line rather than from the floor.
That matters because floors here are frequently not level. A fall of ten or fifteen millimetres across a kitchen wall is unremarkable, and a run of base units set to the floor will follow it — which means the worktop rises visibly along its length and the gap under the wall units grows or shrinks as your eye travels along it. Both are obvious once seen and impossible to correct afterwards.
Adjustable legs exist for this. Each unit is brought up to the datum independently, which means the tops of all the units form one plane regardless of what the floor is doing, and the varying gap at the bottom disappears behind a plinth that gets scribed to the floor.
The units are then joined to each other. A run of cabinets clamped and fixed together behaves as a single object: it resists racking, it keeps the fronts in the same plane, and it stops individual units drifting when they are loaded. A kitchen of separate boxes standing next to each other is where inconsistent door gaps come from.
And there is a downstream reason that costs real money. A stone or quartz worktop is templated against the installed base run. If that run is not flat and level, the template records the error, the fabricator makes to the template, and what arrives either rocks, sits proud at one end or gaps at the wall. Correcting it at that stage means a remake, and the argument about whose error it was is one nobody enjoys.
One unit in every kitchen lives a different life from all the others, and it is worth designing separately.
The failure is specific and it is the most common thing we are called to. Engineered board — MDF and chipboard — is laminated or foiled on its faces, and that surface is effectively waterproof. Its cut edges are not, unless somebody has banded or sealed them. Water that reaches an unsealed edge is absorbed, the board swells, and it does not go back down when it dries. The base of a sink unit swells at the front edge and around the service cut-outs, the plinth grows a lip, and the door stops sitting flat.
It happens because sink cabinets get wet. Not usually from a dramatic burst, but from a waste connection weeping slowly, a tap tail sweating, a dishwasher hose seeping at a jubilee clip, a filter housing dripping, or somebody putting a bottle of cleaner away with a wet base. Over a year, a small amount of water reaching the same edge repeatedly is enough.
Designing against it is cheap at the point of making and impossible to add later: band or seal every cut edge in that cabinet, seal around the waste and supply penetrations rather than cutting a rough oversized hole, and keep the base up off the floor. Some installations add a tray or a sealed base, and where a property is left empty for long periods that is worth doing.
The Dubai-specific part is the humidity swing. A property with the cooling off through the humid months goes from a dry conditioned interior to something much wetter, and board takes up moisture from the air as well as from leaks. Kitchens in villas that sit empty over the summer show this as doors that no longer close cleanly and drawer boxes that tighten in their runners.
It also means a slow leak that would be obvious in a cool dry room can go unnoticed here for months. Which is why, when the swelling has already happened, the first job is finding the water rather than replacing the cabinet — because a new cabinet on a live leak has a known future. If nothing under the sink is obviously wet and the damage keeps progressing, that is a job for leak detection Dubai before any carpentry.
Hardware is the part of a kitchen you interact with, and setting it is a distinct step that is very often skipped.
A modern concealed hinge is adjustable in three directions once fitted: side to side, in and out, and up and down. That adjustability is the entire reason it exists. A door hung on unadjusted hinges is in an arbitrary position; a door that has been set is in the right one, and the difference across a run of ten fronts is the difference between a kitchen that looks made and one that looks assembled.
The tell is the gaps. Look along a run of doors and drawers at eye level. Consistent gaps of the same width, top to bottom and door to door, mean somebody spent an hour setting them. Gaps that taper, or a drawer front that sits a couple of millimetres lower than its neighbour, mean nobody did.
Runners are the same idea with more consequences. A drawer that is loaded with pans and mounted on runners rated for less will drag, tip at the front and eventually pull its fixings. Full-extension runners let you reach the back of a deep drawer, which in a small kitchen is worth more than an extra cabinet. Soft-close is a mechanism rather than a grade, and a cheap soft-close runner is still a cheap runner.
Then there is the substrate the hardware is mounted into, which is where the long-term outcome is decided. A hinge plate screwed into chipboard holds well once. When it works loose and is re-screwed into the same hole, it holds badly, and the third time it does not hold at all. Repairs that last use a solid plug, a dowel or an insert rather than a longer screw, and that work is furniture repair Dubai rather than a tightening.
Lift mechanisms on wall units deserve a mention because they are the most commonly under-specified item in a kitchen. They are rated against door weight and height, and a mechanism that is marginal for the door it holds will either not stay up or will slam. Getting that right at specification costs nothing; getting it wrong means replacing hardware on a finished kitchen.
More kitchen projects are delayed by sequencing than by work, and most of the sequencing decisions are made before the cabinets are ordered.
Appliance apertures are not standard between manufacturers in the way people assume. An integrated dishwasher, an oven housing, a hob cut-out and a fridge aperture all have specific dimensions, and integrated appliances additionally need a particular door-fixing arrangement and a particular hinge. Ordering cabinets before the actual appliance models are decided is a gamble that is settled on installation day.
Ventilation and clearance are the other half of it. Ovens and fridges need air paths, extractors need a duct route or a recirculation plan, and hobs need clearance to whatever is above and beside them. A design that ignores this produces a cabinet that has to be cut into after it is fitted.
Services have to be first fixed to agreed positions before cabinets exist. Water supply and waste for the sink and the dishwasher, and power for the hob, the oven, the extractor and the worktop sockets. Moving a waste pipe after the units are in is not an adjustment; it means taking units out. Where new circuits or new socket positions are involved that is licensed work, and it belongs to wiring installation Dubai rather than to the kitchen fitter.
Then comes the wait that surprises everybody: worktop templating. A stone or quartz top is templated against the finished base run and then made, which takes time that cannot be compressed by templating earlier. Anyone offering to template before the units are installed and levelled is proposing to record dimensions that do not exist yet.
Tiling and splashbacks come after the worktop, not before, because the worktop sets the height they finish at. Second-fix plumbing and electrics happen once the top is in and the cut-outs are made. And the final adjustment of fronts happens at the very end, after everything else has stopped moving.
It is worth saying plainly that a kitchen involves trades that are not carpentry — plumbing, electrical, tiling, stone — and any quotation for cabinets alone excludes them. That is not a hidden cost, but it is a cost, and knowing it at the start is the difference between a budget and a surprise.
A substantial share of kitchen enquiries do not need a new kitchen, and it is worth checking before spending.
If the carcasses are sound, square and dry, a great deal can be done without replacing them. Fronts can be changed entirely — new doors and drawer faces on existing boxes transform how a kitchen looks for a fraction of a replacement. Hardware can be upgraded, and worn hinges and runners replaced with better ones. Worktops can be replaced independently of the units. Handles alone change more than people expect.
The test is the boxes. Open a cupboard and look at the back corners, the base and the underside near the sink. If the board is intact, the joints are tight and nothing has swollen, the kitchen has good bones. If the base of the sink unit has broken down, several hinges have pulled out and the board is soft anywhere it is pressed, refacing good-looking doors onto that is money spent on something that is failing underneath.
The second test is the layout. If the kitchen does not work — the fridge door hits the island, there is no landing space beside the oven, the corner cabinet is unreachable — no amount of refacing fixes it, because the problem is where things are rather than what they look like. That is a genuine reason to start again.
The third is what is behind. If the strip-out will reveal an old service run that needs replacing anyway, or if you are changing the plumbing and electrical layout, keeping the cabinets is a false economy because they will have to come out for the other work regardless.
For rented property there is a fourth consideration: what is worth doing to a kitchen you do not own. Adjusting doors, replacing hardware and fixing a swollen plinth are all reasonable. A full refit generally is not, and the more common sensible package is a repair visit plus what is needed to satisfy a check-out. Where that overlaps with the rest of a property being put back, move-out painting Dubai covers the same end-of-tenancy logic on the decoration side.
We would rather do the smaller job well than sell a kitchen to somebody who needed an afternoon of adjustment, and we will say which one you are looking at after seeing it.
A few things from your side remove most of the friction from a kitchen installation.
The actual appliance models, decided and confirmed, before cabinets are ordered. Not the category — the specific models, with their aperture and clearance requirements. This is the single most common cause of a stall on the day.
A clear decision about the worktop material, because it changes the sequence. A stone or quartz top brings a templating wait; a timber or laminate top can often be cut and fitted in the same visit as the units.
The room emptied and, where possible, the old kitchen already disconnected by the relevant trades. A day spent waiting for a plumber to isolate a supply is a day of the installation.
Access arranged. In a tower that means a service lift booking and often a permit, and it applies to the delivery of the units, the removal of the old kitchen and the arrival of a worktop that two people have to carry.
Somewhere to cook. Kitchens are not usable while they are being fitted, and a realistic view of that at the start is better than an optimistic one halfway through.
And a note of anything already going wrong — a slow drip under the sink, a socket that trips, a floor that is not flat. All of it is easier to deal with while the room is empty than after the cabinets are in.
Pricing
Supply and installation are separate purchases, and quoting them as one number is where most kitchen confusion starts.
You have bought the kitchen.
Quoted on inspection
Replacing an existing kitchen.
Quoted on inspection
The boxes are sound.
Quoted on inspection
A list, not a project.
Quoted on inspection
No surprises on the invoice
No prices, lead times or warranty periods are published here. What you should have in writing before anything is ordered is the carcass board and its edge treatment, the named hinges and runners, the appliance models the cabinets are being built around, and what is excluded.
Coverage
Technicians are dispatched from whichever team is closest, which is why a call from Business Bay and one from Dubailand get different arrival windows.
Related
Property problems rarely stay inside one trade.
Hinges that have pulled out, swollen edges, and cabinet repairs.
Read moreThe same fitted-furniture problem, in a room with different rules.
Read moreIslands, benches and the pieces a standard kitchen cannot supply.
Read moreSink, dishwasher and washing machine connections, and the leaks under them.
Read moreWorktop sockets and appliance circuits, first fixed before cabinets.
Read moreWhat a kitchen needs once the units are back in and the dust has settled.
Read moreTrack Record
The numbers behind the work.
These figures are being confirmed against our records before publication.
Questions
What customers ask before booking, answered without the sales pitch.
Yes, and it is a large part of this work. Supply and installation are separate purchases and it is normal to split them. What we will do first is check the units against the room and against the appliance models, because the two things that stop a fit on the day are a run that does not fit the wall and an aperture that does not fit the appliance.
Because a stone or quartz top is made to the run as installed, not to a drawing. The fabricator records the actual line of the wall, the actual length and the actual level, then cuts to that. Templating before the base units are in and levelled means recording dimensions that do not exist yet, and the top that arrives will not sit right.
Sometimes the base can be replaced within the existing carcass; sometimes the unit is beyond it. Either way the first job is finding where the water came from, because a new base under a live leak has a known future. If nothing is visibly wet and the damage keeps progressing, that is a case for leak detection Dubai before any carpentry starts.
Usually it is hardware that was fitted but never set. Concealed hinges adjust in three directions and doors hung without adjustment sit wherever they happen to land. An hour across a whole kitchen normally fixes it. If adjusting will not hold, the hinge plate has worked loose in the board, and that needs remounting into solid material rather than a longer screw.
It is what most fitted kitchens are made from, and it is flat, stable and takes a finish well. The weakness is any cut edge that has not been banded or sealed, because water reaching it makes the board swell permanently. In a kitchen that means the sink cabinet above all, and it is the reason edge treatment is worth asking about specifically rather than accepting a description of the material alone.
Often, and it is a good option when the boxes are sound. Look at the back corners, the base of the sink unit and the areas around the hinges. If the board is intact and nothing has swollen or pulled out, new fronts and new hardware transform the kitchen for a fraction of a refit. If the boxes are breaking down, refacing them is money spent on something failing underneath.
They are separate and licensed trades, and they are excluded from cabinet work. What we do is agree the service positions at the survey so they can be first fixed correctly, then install around them. Sink and appliance connections are kitchen plumbing Dubai; worktop sockets and appliance circuits belong to socket installation Dubai.
We do not publish timescales, because the honest answer depends on whether there is a strip-out, what the worktop is made of and how much other trade work is involved. What is predictable is the shape: units in, worktop templated, a wait while it is made, worktop fitted, then second fix and tiling. The wait in the middle is the part worth planning around.
Yes, and it is the reason for setting a datum line. Floors here commonly fall across a kitchen wall. Units set to the floor follow it, so the worktop visibly rises and the gap under the wall units changes as your eye moves along. Units set to a level datum have adjustable legs taking up the difference, and the varying gap at the bottom disappears behind a scribed plinth.
We can survey and plan, but ordering cabinets before the specific appliance models are decided is a gamble settled on installation day. Apertures, door-fixing arrangements for integrated units, hinge types and ventilation clearances differ between manufacturers. Deciding the models first costs nothing; discovering the difference after the cabinets are made costs a cabinet.
It gets a filler panel, scribed to the wall. Dead gaps at the end of a kitchen collect everything and cannot be cleaned, and closing them is a specification item rather than an afterthought. The same applies to the gaps at the ends of wall units and above tall units, which is what cornices and end panels are for.
We do not publish a period, because what can honestly be supported depends on whose cabinets they are, what the hardware is and what the environment does to them. What we do provide is a written specification before anything is ordered — the board and its edge treatment, the named hinges and runners, the appliances the design is built around, and what is excluded.
Book Today
Tell us what it is doing and we will give you a realistic arrival window. Free inspection when the repair goes ahead.
Book a Visit
Give us the details and we will call you back to confirm a time. The more you can tell us, the better prepared the technician arrives.
Both are urgent for different reasons. Empty a loose wall unit before anything else, and for water under a sink, turn the isolators off and tell us what is wet — the leak matters more than the cabinet.
Full Coverage
All 30 Dubai communities, grouped by property type because the work genuinely differs between a tower in DIFC and a villa in Arabian Ranches.