A renovation goes wrong in the gaps between trades. The tiler waits on the plumber, the plumber waits on a decision nobody made, and three weeks disappear while everyone is technically waiting for somebody else.

We run bathrooms, kitchens and whole flats with one team and one person answerable for the programme. Our own plumbers, electricians, tilers, carpenters and painters, in the right order.

  • One team, one programme, one contact
  • Approvals and building permissions handled
  • Written scope before anything is stripped
  • Homes and commercial fit out
A finished open plan office floor in daylight, clean and ready to be used

What we take on

From a single room to a whole flat. The size changes the programme, not the way it is run.

  • Bathroom renovation

    Stripped back to the structure, waterproofed properly, then replumbed, tiled and fitted. The tanking underneath is what stops it leaking into the flat below in five years, and it is the layer people cut to save money.

    UsuallyTwo to three weeks, typically

    Why tanking matters
  • Kitchen renovation

    New units, worktops, appliances, plumbing and power. The awkward part is always the services: moving a sink or a hob means moving waste, water and a circuit, and those decisions have to be made early.

    UsuallyServices decided first

  • Whole flat refurbishment

    Usually between tenants or after a purchase, when the property is empty and everything can happen at once. It is by far the cheapest time to do work, and the only time some of it is possible at all.

    UsuallyBest done empty

  • Villa upgrades

    Extending a kitchen into a utility room, converting a maid’s room, opening up a wall between two spaces. Structural work needs approval and drawings, which we arrange rather than hand you a list.

    UsuallyApprovals arranged

  • Office and retail fit out

    Partitions, ceilings, flooring, power and data, worked around a lease date. Most of it happens outside trading hours where the space is occupied.

    UsuallyWorked to a lease date

  • Flooring changes

    Taking up tile and laying vinyl, engineered timber or new tile, with the levelling underneath that decides whether it looks right at doorways and thresholds.

    UsuallyLevels checked at thresholds

How a renovation actually runs

The scope is agreed in writing before anything is touched. It is the document that decides who is right when there is a disagreement in week three, and there is usually a disagreement in week three.

You get a programme with dates, and you get told when it slips and why. Nobody finishes a renovation without something slipping. What separates a good job from a bad one is whether you heard about it from us or noticed it yourself.

  1. 1

    Survey and scope

    A walk round, measurements, and an honest conversation about what is possible in the building you are actually in. Then a written scope with what is included and what is not.

  2. 2

    Approvals and access

    Most towers need contractor documents, insurance and a work permit before anyone lifts a tool, and structural changes need drawings submitted. We handle that rather than leaving you to chase the management office.

  3. 3

    Strip out and first fix

    Out with the old, then the services: pipework, cabling, waste runs and waterproofing. Everything that ends up buried happens here and it is the stage worth photographing.

  4. 4

    Second fix and finishes

    Tiling, carpentry, units, painting and the fittings. This is the part that looks like progress, and it is the shortest part of the job.

  5. 5

    Snag and hand over

    We walk it with you and write the list, rather than waiting for you to find things. Snags are fixed before the final invoice, not after it.

Finished work

The end of a renovation should look like nothing happened, other than the thing you asked for.

  • A painter spreading polished plaster across a wall with a steel trowel
    Before
    The finished wall in a smooth warm polished plaster finish
    After

    Polished plaster applied and finished, in a villa living room.

  • A worn warehouse floor with faded line markings and staining
    Before
    The same warehouse floor coated in grey and blue with fresh yellow line markings
    After

    A commercial floor stripped, coated and remarked.

The three things that add cost after you start

The first is changing your mind after first fix. Moving a socket on a drawing is free. Moving it after the wall is closed is a day for two trades. Decide the layout before anything is buried and the programme holds.

The second is what is behind the wall. Old pipework in poor condition, a wall that turns out to be structural, or waterproofing that was never done. Nobody can price this before it is opened, which is why an honest quote says what happens if it is found rather than pretending it will not be.

The third is the building. Towers have permit hours, lift bookings and rules about when noisy work can happen, and a programme written without checking them is fiction. We check first, which is less exciting than starting on Monday and more likely to finish on time.

We also cover plumbing, electrical, handyman, painting, carpentry, tiling and renovation. An annual maintenance contract puts the lot on one schedule, or see everything we do.

Where our technicians go

Across the whole city, from the Marina and Downtown out to Mirdif, Al Barsha and the newer communities. If your building is not listed it does not mean we do not come.

New Dubai

  • Dubai Marina
  • Jumeirah Lakes Towers
  • Palm Jumeirah
  • Jumeirah Beach Residence
  • Emirates Hills
  • The Greens and The Views
  • Discovery Gardens
  • Dubai Media City

Central Dubai

  • Downtown Dubai
  • Business Bay
  • DIFC
  • Al Barsha
  • Jumeirah
  • Umm Suqeim
  • Al Quoz
  • Trade Centre

Old Dubai

  • Deira
  • Bur Dubai
  • Al Karama
  • Al Nahda
  • Mirdif
  • Al Qusais
  • Oud Metha
  • Garhoud

Outer communities

  • Arabian Ranches
  • Jumeirah Village Circle
  • Dubai Silicon Oasis
  • Dubai Sports City
  • Damac Hills
  • Motor City
  • Dubai Hills Estate
  • International City

Questions we get asked on the phone

How long does a bathroom renovation take in Dubai?

Two to three weeks for a straightforward one, from strip out to usable. Waiting time for materials is the usual reason it runs longer, so choosing tiles and sanitaryware before the start rather than during it makes a real difference. If the building only allows noisy work in certain hours, add to that and we will tell you at the quote.

Do we need approval from the building?

For an apartment, almost always. Most towers want the contractor trade licence, insurance and a work permit before anyone starts, and some restrict working hours or need a lift booking for materials. Structural changes and anything affecting a shared service need drawings submitted. We arrange all of it as part of the job.

Can we live in the property during the work?

For a single bathroom in a flat with two, usually yes. For a kitchen it is difficult, and for a whole flat refurbishment it is genuinely not worth it. Work goes faster in an empty property, costs less because nothing has to be protected and unprotected daily, and finishes sooner.

What happens if you find something unexpected?

You are told the day it is found, with photographs, what it means and what it costs to put right. Nothing gets covered up quietly and nothing gets added to the invoice without you agreeing to it first. Old pipework, missing waterproofing and unsound substrate are the three we find most.

Do you use your own trades or subcontract?

Our own plumbers, electricians, tilers, carpenters and painters, which is the whole point of using one company. The gaps between trades are where renovations lose time, and they close when everyone works for the same people and the programme is one person’s responsibility.

Can you work to a design or drawings we already have?

Yes. Bring them and we will price the work as drawn, and tell you where the drawing meets reality. Designers do not always know where the risers run in a specific tower or which walls take load, and it is better to find that out at the quote than in week two.

Book a renovation survey

Tell us the property and roughly what you want done. A survey and a written scope cost nothing and are worth having before you commit to anyone.